top of page
China_Lake_1_edited.jpg

2023 Erosion Reduction Campaign Remediation Sites

Our Erosion Control Team worked with property owners and the Youth Conservation Corps over the summer to install phosphorus reducing features such as infiltration steps, shoreline buffers and drip lines.  Read their stories below!

Fire Road 28
Fire Road 37 - Site 1
Fire Road 37 - Site 2
Kildeer Point

Masthead photo credit: Jason Rushing

bottom of page